Panel upgrades

A new appliance does not always mean a new panel. The first step is to assess the existing supply and the loads it needs to serve.

Electrical panel with organised and labelled circuits

The service

A panel with room for the next change.

Adding a charger or extending a kitchen can put new demands on an older installation. We look at the supply, the circuits already in use and the equipment you are planning to add. If the existing panel can do the job, the recommendation should say so. If it needs replacing, you should know why.

What the work covers

  • Review the existing panel and planned appliances
  • Agree the scope, permits and any utility coordination
  • Plan the interruption and label the finished circuits

Share a photo of the closed panel, the property type and any equipment you plan to add. An electrician can then explain what needs an on-site assessment and what can be priced in advance.

How the job takes shape

  1. 01

    Assess the supply

    Review the existing installation and the proposed loads on site.

  2. 02

    Agree the specification

    Set out the panel, protection, approvals and any utility work required.

  3. 03

    Install and test

    Complete the agreed work during the planned interruption, then test it.

  4. 04

    Label and explain

    Walk through the panel and provide the records the owner needs.

An electrician working on the wiring in an electrical panel

The details that matter

  • Capacity assessed against the equipment you intend to use
  • Power interruptions arranged around the household
  • A circuit schedule that makes the finished panel understandable
  • Test results and installation documents kept together
Explore all services
Electrician fitting a light switch

Planning electrical work?

Let’s discuss
the details.

Get an estimate